New Lodge Project Who's Who.

CLIENT. St. Albans District Council (SADC).
SADC EXECUTIVE LEADER. Cllr Julian Daly.
SADC LEISURE, HERITAGE AND CULTURE PORTFOLIO HOLDER . Cllr Mike Wakely.
SADC HEAD OF LEISURE. Richard Shwe.
SADC NEW LODGE PROJECT MANAGER. Ms Julie Simpson.
SADC NEW LODGE CLERK OF WORKS.Phil Stock.
SADC MANAGING AGENTS .Drivers Jonas Deloitte.
 
NEW LODGE MAIN CONTRACTOR . Willmott Dixon Construction Ltd.(WDCL).
WDCL PROJECT DIRECTOR. Simon Ramage.
WDCL SENIOR SITE MANAGERS. Mike Pennington, John Allworth and Trevor Milton.
 
NEW LODGE ARCHITECT. S&P Architects.
 
NEW LODGE OPERATOR . Sports and Leisure Management Ltd. New Lodge manager Alison Norman.
WDCL SUB CONTRACTORS. 
 
PC COONEY. Groundworks.
PC COONEY CONTRACTS MANAGER. Omar.
HANSEN. Ready Mixed Concrete.
MITCHELL. Heavy haulage.
MIFFLIN. Steel frame structure.
MIMRAM. Temp Electrical Works.
KALZIP. Specialist aluminium roof forming.
T.LOTT. Plastering,dry lining,partitions & suspended ceilings.
DB RYDER. Blockwork package.
D&R SCAFFOLD. Scaffolding.
AQUA PROCESS ENGINEERING. Filtration package.
TR FREEMAN. Roofing & cladding package.
STONE CONNECTIONS. Facade masonry.
IMTECH AQUA. Mechanical & electrical package.
JPJ INSTALLATIONS. Curtain walling and glazing.
FIRE SHIELD. Intumescent paint.
AIRTECK. External louvres.
KONE. Passenger lifts.
VARIOPOOL. Moveable pool floors.
ROOF GLAZE. Polycarbonate roof lights.
MERONDEN DESIGNS. Structural glass boxes.
WALLGLAZE. Specialist glass installation.
SHARDA GLASS. Glass manufacturers.
S.E.FIXING.Specialist glass installation.
ROCKWORKS. Climbing wall.
GRANWOOD FLOORING. Sports hall floor.
LONDON WALL. Moveable walls.
VA HUTCHINSON. Spung floors to gym/dance studios.
HCL SAFETY. Mansafe system.
HORIZONTAL. Soft flooring.
PROSPEC. Cubicles and lockers.
SWISS TIMING. Pool timing equipment.
TCS CONTRACTING. Floor screed.
LAMI DOORS. GRP doorsets to changing village area.
WILCOX FABRICATIONS. Architectural metal work.
BLUE CUBE. Spectator seating.
FITZPATRICK DOORS. External metal doors. 
WELLSWOOD CERAMICS. Ceramic tiling (pool tanks).
M&S CONTRACTORS. Carpentry.
FACADE SYSTEMS. Insulated render to externals.
WILCOX FABRICATIONS. Architectural metalwork.
DALE SAUNA. Spa area fit out.
A&B DECORATIONS. Decorations.
SWIMMING POOL SAFETY COMPANY. Underwater cameras.
FORGE LEISURE. Pool cover.
MG OLYMPIC. Pool equipment.
STADIA SPORTS. Sports equipment.
BOLTON GATE. Roller shutter to plantroom.
GLASS INSTALLATIONS. Mirrors and ballet bars.
KINGKRAFT. Disabled hoist.
JBW. Landscaping works.
PEMBURY FENCING. Railings and gates.
NORTHGATE BLINDS. Blinds.
TILLEY AND BARRETT.Demolition of Old Lodge.
 
This list has been compiled by PoolTooSmall in an attempt to answer the many questions we get asked on site about the New Lodge Project generally. It also highlights, we feel, just how complex this £25 million project is and we should be proud of the considerable range of British and European engineering expertise being shown throughout. If you the reader feels there are any errors or omissions in the above please contact us as always on newpooltoosmall@ntlworld.com
 